C&EE X 407.3
Construction Scheduling with Primavera® (P6)
This course presents an in-depth study of the current systems and techniques applied in construction planning, scheduling, control and delay impact analysis.
Instruction emphasizes the Critical Path Method approach to developing baseline schedules, progress measurement, earned value, integrated management systems and as-planned versus as-built analysis.
The course also includes hands-on computerized scheduling using Primavera Systems software.